Quality Policy :::
“Sun Forge.” is committed to achieve customer
satisfaction through follow customer’s requirements. This
commitment is met through laid-down quality management system
in the organization.

>>
Quality Objective :::
1. To provide
on-time delivery.
2. To resolve customer complaint.
3. To maintain customer satisfaction.
4. To adopt latest technology.
>>
Mission :::
The
mission of Sun Forge.
is to achieve the Total Customer
Satisfaction by safely supplying the highest quality
forgings and services possible at the earliest appropriate time.
>>
Vision :::
“Sun Forge.” always practice for continuous improvement
to the benefit of all customers, team members and suppliers. We
seek to grow in expertise and technological
capabilities while maintaining flexibility to
change thus meeting changing needs and expectations.
>>
Quality Control :::
The
Sun Forge. has set
high performance goals for organization which are expressed in
Mission and Vision Statements. It shall be the goal of The Sun Forge. to meet and maintain total quality objectives
such that the quality systems of the company will be certifiable
to the requirements of ISO 90001 (TUV Rheinland).The
purpose of this goal shall be to create whatever organizational
structure and management systems are necessary to assure customer
service and product performance exceed customer expectations.
Master
drawing files include all or part of the following :
Customer
supplied drawings :
Sun Forge. generated drawings :
-
Die
Drawings
-
Tooling
and Fixture drawings
• Master
drawing files are stored and maintained in the Quality Center
and/or computer files, according to customer name, part number.
•
After
completion of the order, all drawings are returned to the Quality
Center for storage.
Top
-
Tooling
consists of all items used to produce an end product.
-
All
tooling is marked with an identification number.
-
Identification
numbers are catalogued according to die type & number.
-
Usage
history records are maintained for all tooling.
Top
>>
3.0 Measurement Equipment |
-
All
measurement equipment used in production and inspection will
be inspected by Quality Assurance for compliance with all applicable
standards.
-
Equipment
requiring calibration shall be calibrated by qualified outside
agency for calibration/repair under the supervision of Quality
Assurance.
-
All
measurement equipment used will have a permanent identification
number.
Calibration Records is maintain for all measurement equipment
.
Top
>>
4.0 Receiving Inspection |
-
All
receiving materials (critical items) are inspected at receiving
stage as per the respective specification/quality plan/purchase
order requirements. As a policy of Sun Forge., without any incoming inspection material
is not issued for further operation.
-
Supplier
certifications are required for all raw material purchased for
production and are permanently retained. The raw material inspection
& testing are carried out as per quality plan / as per the
customer’s requirements from outside agency. The result
of such inspection is verified with acceptance criteria.
-
Material
size and weight are verified upon delivery.
-
Independent
laboratory analysis of material will be performed when required
by the customer. Laboratory certifications are permanently retained.
-
Rejected
material is segregated from all other material with tags to
indicate the status and reason for rejection.
Top
>>
5.0 Production Planning |
Sun Forge. is prepared production planning Based on
the order/schedule acceptance, monthly requirements. Production
plan to be carried out considering the manufacturing capacity
and lead-time. Based on the stock statement, requirement &
production plan, raw material planning is carried out. Delivery
schedule is provided to all the vendor/subcontractor. In-house
manufacturing product and vendor-supplied product are monitored
as per the delivery schedule.
Top
>>6.0
Identification & Trace Ability |
Top
>>7.0
Set-up & In Process Inspection |
-
Set-up
inspections are used to check dimensions of the first ten parts
produced during every production run. Operators will adjust
machinery and/or tooling until inspection approval is achieved.
-
2 Pcs per Hour is our inspection frequency for running production.
-
Parts are inspected by Shift In charge, Inspector & QC In
charge as necessary, to determine parts produced are within
correct specifications.
Top
Sun Forge. doing process control as per the Product
Flow Chart & Quality Plan.
All operations are carried out as per the product flow chart and
the quality plans are displayed for the relevant stage at the
work area. Required work instructions / charts are prepared and
displayed near the working area. Before start of production or
while changing over, first piece approval is carried out. During
the production, product parameters are monitored as per the quality
plan at defined frequency. In case of any discrepancy observed
during the production corrective action is taken. Daily production
and nonconformity is monitored.
Top
>>
9.0 Pre Dispatch Inspection |
10 Pcs For
every Lot is checked before predispatch.

Top
::::
QUALITY ASSURANCE ::::
| |
|
Chemical
Testing & Chemical Spectro Analysis |
| |
|
| Nondestructive
testing capabilities : |
A.
Contact and immersion ultrasonic
B. Magnetic particle
C .Dye penetrant |
|
| |
|
Mechanical
Testing Lab |
| |
|
Metallography
Lab |
|